Completed Projects

East Lansing Public Schools – Pinecrest and Whitehills Elementary
East Lansing Public SchoolsConstruction of two new Elementary Schools as part of a 94 million dollar bond proposal. Features include state of the art classrooms, meeting spaces, STEM space and Geothermal Heat Loop System.

Sparrow Laboratory – Sparrow Reference Lab
Sparrow HospitalState of the art 35,000 square foot laboratory facility. The building features high efficiency HVAC and plumbing systems. A steam generated humidification system as well as medical grade filtration.

Ascension Medical Center
Assencion Medical GroupNew multi-story 60,000 square foot medical facility featuring outpatient surgical suites and ambulatory care facilities.

Cole Academy 2018 Project
Cole AcademyOne of the oldest charter schools in Michigan, Cole Academy East is a new K-6 charter school located in East Lansing. The construction featured a single story ground up construction featuring high efficiency HVAC and Plumbing systems.

Dart Container Corp. – Building
Dart Container CorporationInstallation of several large air rotation units to improve IAQ in the plant. Project consisted of installation of large air handlers, hydronic piping and sheet metal duct work.

Sparrow Hospital – Herbert Herman Cancer Center 3rd and 4th Floor
Sparrow Hospital130,000 square foot facility with an adjacent 600 car pre-cast parking structure. The facility contains state of the art cancer treatment facilities with clinical space on the upper floors.

MSU Federal Credit Union – Head Quarters 2
MSU Federal Credit UnionServing as the second headquarters for Michigan State University Federal Credit Union, the 186,000 square foot facility is designed to house up to 564 employees. The project was built using high-efficiency, environmentally-friendly and locally-sourced products. Prefabrication of bathroom groups and fixtures was utilized to expedite the schedule.

MSU – Spartan Stadium South End zone Addition
Michigan State UniversityFast Track project with a six month completion time. 20,000 square foot single story addition with 236 restrooms and four concessions areas. Plumbing and mechanical systems were fabricated off site in a controlled environment to meet the stringent project schedule and just in time delivery was utilized.