We have produced OUTSTANDING RESULTS for more than 30 years!

Completed Projects

Image

MSU Veterinary Medicine

MSU Veterinary Medicine

Extensive renovation, HVAC and infrastructure upgrades, and modernization project at the Michigan State University Veterinary Medical Center. The upgrades will allow the hospital to better serve local families and their animals.

Image

McLaren Karmanos Cancer Center

McLaren Karmanos Cancer Center

This 46,000 sq./ft. medical cancer center will bring state of the art treatment options to the Lansing area. The building was built in partnership with McLaren Greater Lansing, Karmanos Cancer Center and Michigan State University.

Image

MSUFCU Tower East Lansing

Michigan State University Federal credit Union

Seven Story, 81,000 Sq/Ft. Mixed use office building located downtown East Lansing. The building is equipped with high efficiency heat pumps and low consumption plumbing fixtures. Space is expected to open in the summer of 2023.

Image

Sparrow Laboratory – Sparrow Reference Lab

Sparrow Hospital

State of the art 35,000 square foot laboratory facility. The building features high efficiency HVAC and plumbing systems. A steam generated humidification system as well as medical grade filtration.

Image

Ascension Medical Center

Assencion Medical Group

New multi-story 60,000 square foot medical facility featuring outpatient surgical suites and ambulatory care facilities.

Image

Dart Container Corp. – Building

Dart Container Corporation

Installation of several large air rotation units to improve IAQ in the plant. Project consisted of installation of large air handlers, hydronic piping and sheet metal duct work.

Image

Sparrow Hospital – Herbert Herman Cancer Center 3rd and 4th Floor

Sparrow Hospital

130,000 square foot facility with an adjacent 600 car pre-cast parking structure. The facility contains state of the art cancer treatment facilities with clinical space on the upper floors.

Image

MSU – Spartan Stadium South End zone Addition

Michigan State University

Fast Track project with a six month completion time. 20,000 square foot single story addition with 236 restrooms and four concessions areas. Plumbing and mechanical systems were fabricated off site in a controlled environment to meet the stringent project schedule and just in time delivery was utilized.