Completed Projects

MSU Veterinary Medicine
MSU Veterinary MedicineExtensive renovation, HVAC and infrastructure upgrades, and modernization project at the Michigan State University Veterinary Medical Center. The upgrades will allow the hospital to better serve local families and their animals.

McLaren Karmanos Cancer Center
McLaren Karmanos Cancer CenterThis 46,000 sq./ft. medical cancer center will bring state of the art treatment options to the Lansing area. The building was built in partnership with McLaren Greater Lansing, Karmanos Cancer Center and Michigan State University.

MSUFCU Tower East Lansing
Michigan State University Federal credit UnionSeven Story, 81,000 Sq/Ft. Mixed use office building located downtown East Lansing. The building is equipped with high efficiency heat pumps and low consumption plumbing fixtures. Space is expected to open in the summer of 2023.

Sparrow Laboratory – Sparrow Reference Lab
Sparrow HospitalState of the art 35,000 square foot laboratory facility. The building features high efficiency HVAC and plumbing systems. A steam generated humidification system as well as medical grade filtration.

Ascension Medical Center
Assencion Medical GroupNew multi-story 60,000 square foot medical facility featuring outpatient surgical suites and ambulatory care facilities.

Dart Container Corp. – Building
Dart Container CorporationInstallation of several large air rotation units to improve IAQ in the plant. Project consisted of installation of large air handlers, hydronic piping and sheet metal duct work.

Sparrow Hospital – Herbert Herman Cancer Center 3rd and 4th Floor
Sparrow Hospital130,000 square foot facility with an adjacent 600 car pre-cast parking structure. The facility contains state of the art cancer treatment facilities with clinical space on the upper floors.

MSU – Spartan Stadium South End zone Addition
Michigan State UniversityFast Track project with a six month completion time. 20,000 square foot single story addition with 236 restrooms and four concessions areas. Plumbing and mechanical systems were fabricated off site in a controlled environment to meet the stringent project schedule and just in time delivery was utilized.